I think I know the answer to this, but I would like someone to verify. I'm been trying to control when the SharePoint Catalog Tape Task runs on my DPM 2010 server using this article: http://technet.microsoft.com/en-us/library/ff634233.aspx

Although I receive no errors when I issue the command, I'm not seeing the schedule of the job change in the DPM console. I can find no explanation for this, but I did find an error that exists while perusing the DPM 2010 Error Code catalog (although it's not throwing it in my case as far as I can tell). The error that I feel like I should be seeing is listed here: http://technet.microsoft.com/en-us/library/ff399290.aspx

31042  Cannot specify offset schedules for protection groups configured only for tape-based protection.

Can anyone shed any light on this?

link|improve this question

78% accept rate
feedback

Know someone who can answer? Share a link to this question via email, Google+, Twitter, or Facebook.

Your Answer

 
or
required, but never shown

Browse other questions tagged or ask your own question.